Photo's of Fire Hall #2 (Meadowood)
as Construction progress.
Should any member wish for a larger version of any of these photo's
please contact the Web Master
DASHWOOD FIRE HALL #2
to be located at 1800 Galvin Place, off Meadowood Way.Building Color Scheme
Floor plans.
Work on the Fire Hall Construction site commenced today February 12th, 2009
To see the photo's as things progress please scroll down slowly to the various stages.
PLEASE NOTE IMPORTANT INFORMATION
See Next Item
The Construction Site is off limits to all unless permission has been granted by the Site Superintendent and you must be wearing full safety gear. Hard Hat, Hi-Vis Clothing and Steel Toed Boots as per WCB.
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Work on site was held up due to weather conditions the contractors were supposed pour concrete for the walls today but this has been delayed 24 hrs
All under ground plumbing and electrical conduits within the building structure are now in place as of Friday 6th of March.
The sewer lines and other lines were filled with water for testing with the aid of the fire department tanker truck.
Monday 9th March, the first of two loads of the steel building arrived today, the remainder finally arrived mid-afternoon Wednesday March 11th.
Erection of Steel Frame work commenced mid-afternoon Thursday 12th March.
While the erection of the steel work continues entrance to the site has been move
approx 60 feet west, to provide level entry onto the road.
Next will be the re-alignment of the road within the site.
Re-alignment of road started on Monday 23rd, March
New Access Road completed Tuesday 24th, March.
However at the end of June we had to lower the road to match the front forecourt.
Grading of the site slopes commenced to day Saturday 14th, March
It snowed again over Sunday and Monday night 15/16th March,
Framing of the wood section started today Monday 23rd, March
Steel Erectors commence installing the walls to-day Wednesday 25th, March
The plastic membrane for water proofing the floor, then the re-bar mat is being put into place.
The floor is honeycombed with electrical conduits, note the grey plastic lines.
This means nothing can be bolted down to the concrete floor.
The start of the roof installation
Internal Colour scheme
April 8th, 2009
Pouring of concrete for the finishing of the floors of the Meeting Rm & upstairs room.
The truck bay floors pouring will happen to-morrow.
The Concrete work inside the building is now completed and
framing has commenced on the stairs and also the washrooms
Framing and plumbing underway in the washrooms
Mechanical Rm frame up
Installation of window shutters these will protect all windows.
The brown trim on the Right-hand side
is the base for the wall cladding
It may appear that construction has stopped but work is proceeding with the plumbing and electrical wiring.
Steel Wall Cladding underway on the
remaining parts of the building.
Outer man doors have finally arrived on the 7th May however they have windows in them and should be solid for security reasons.
See Below the problem was solved
![]()
Soffit's have now been completely installed
Viewed from the outside Viewed from inside Installation of Truck Bay doors has now been completed and awaiting for the operating gear to make them electrically operated with manual over ride in the event of power failure.
Operating gear being installed with manual override in the event of power failure.
Preparing the ground for the truck bay forecourt.
Rear Forecourt & General View
Preparing the ground for the foundation of the Rain Water collection tank Rain Water Collection Tank Moving Day 29th, May 2009
This tank will provide water for fire tankers
Departing Dashwood
On Route
Corcan Road underpass
Corcan Road underpass - we made it!
Turning into the #2 Fire Hall Site There is still lots of work to be done on this tank before it can become operational.Getting the old blanks off in which the bolts were well rusted in place and then cleaning up all the extra protrusions.
Foundation slab poured for the Tanker Filling Pump expected on site about 21st June. Water tank has received it's first coat of primer paint today July 4thLater the same day
the final top coat of paintOutlet flange now installed with the two valves one is for refilling,
the other will feeding the fire pumpThe Tank compound now has fencing post concreted into the ground plus security straps
Showing the anchors attachments for security straps
Fencing is completed with barb wire topping
and awaiting the gates due to-morrow 21st July.Tank Compound fencing completed
Dry-walling commenced on the ceiling etc to create the fire stops
Radiant Heat and other duct work being installed.
Propane will be the fuel used for heating
Gas line laid from building to the propane tank
Safety Bollards installed to protect
propane tank
Propane tank arrives on site
Unloading in progress onto the pads
1000 gallon tank now in place
Tank now connected to the system
Excavating for Hydro and Telus Ducts
BC Hydro inspected the cable ducts this afternoon 5th May and
gave permission for back filling from the building.
Main power supply and breaker boards for the building.June 12th, BC Hydro was on site pulling in the new main cable
Communication is very important, hence the need for a radio antenna
to connected to #1 Fire Hall, Trucks & North Island 911
Our Radio Technician doing the installing
Showing the mast head
Finally the mast and antenna
Cabinet work is being installed
Multi purpose coffee bar
Toilet Vanity
Meeting room Kitchen
Multi purpose room now completed
Toilets and shower now completed
Meeting Room now completed
Work Party today Saturday 4th, July to get the woodposts driven in to mark out the Parking Lot
and also to provide protection to the Septic Field to be installed next Tuesday.
Laying the posts out
Marking the depth to be driven
Driving the first post
Post driving continues
Drilling holes for top rails
Top rails going into place
Crush rock has been added and parking lot being graded and vibrate rolling after being wetted down
Work continues on the Parking lot fencing into the late evening and we are now basically completed
Sewer System Installation under way July 7th, 2009
Septic Tank arrives on site
Tank being lowered into the ground
Connections being made to the
distribution box
Another view of distribution box
Oil Trap from truck floor drains
The main entrance to the building work has started as of July 14th
Footings getting poured
Columns formed up.
Commencement of back fillings
Back filling completed, will now have to be compacted
Commencement of laying paving slabs
Construction of entrance canopy
The completed canopy
Like any major project monthly meetings take place with all concerned
to thrash out any problems or oversights
Tuesday 14th July
A detailed inspection was done and this time it was held in the New Meeting Room at #2 Fire Hall
Meeting Room at Dashwood #1 Fire Hall
Meeting Room at Dashwood #2 Fire Hall
General view of the site on
Thursday 14th, May 2009
Friday 29th, May 2009
Thursday 9th, July 2009
Page Design by Webmaster
March 2009